When Blackcat set out to upgrade their offices, warehouse, and external areas, they had a clear goal: create a modern working environment that was safe, efficient, and ready for the future.
GEC were contracted to deliver a full electrical installation for this project that would not only meet today’s needs but also support their commitment to sustainability.

The Challenge
Most business premises need to be flexible for future change and put provisions in place for changing requirements. This project required an electrical system that could handle the demands of a busy site – catering from everyday office use to heavy-duty warehouse operations.
At the same time, they wanted to reduce running costs, improve safety, and make sure the building was future-proofed for greener technologies like electric vehicles.
This wasn’t just about simply “wiring a building”; it was about creating an infrastructure that would support people, processes, and sustainability for years to come.
Our Solution
Our goal was simple – to deliver a complete electrical installation package, carried out to the latest IET Wiring Regulations and NICEIC standards.
Here’s how we tackled it:
Smarter Power Distribution
We installed a robust distribution system across the site, making sure each designated location had power and sufficient spare capacity on the circuit to expand and adapt in the future.
Outlets were positioned with practicality in mind, so facilities teams can service and maintain systems quickly and safely.
Lighting the Way
Lighting can transform a workplace, both in energy use and in the comfort of those working there.
For this project, we fitted energy-efficient LED lighting throughout, durable fittings in breakout areas and high bay-level LED`s in the warehouse.
To reduce energy consumption, we included smart controls like PIR (passive infrared) sensors. These detect movement, automatically switching lights on when people enter a space and off when they leave. Simple in concept, but highly effective in reducing energy consumption resulting in reduced costs and carbon footprint.
Safety & Compliance
Our site manager ensured all works were completed utilising the correct access equipment and procedures ensuring zero near misses or accidents were recorded.
Safety was a core priority.
We installed a full emergency lighting system, including illuminated exit signage and backup power packs that keep lights on for up to three hours during an outage.
A new addressable fire alarm system was also fitted, with detectors, sounders, and call points spread throughout the building – all tested and commissioned to ensure compliance with the latest standards.
Supporting Key Systems
To keep heating and cooling systems running smoothly, we provided dedicated power supplies and isolators for HVAC equipment.
This makes servicing straightforward and ensures uninterrupted comfort for staff.
Future-Proof Infrastructure
At the heart of the installation is a new main switch panel and distribution boards, each fitted with integrated energy metering.
This gives future tenants the ability to track and manage energy use across the building – spotting cost-saving opportunities whilst aiding energy efficiency planning.
We also installed surge protection devices (in line with current practises) to shield sensitive electronic equipment from power spikes, extending its lifespan and avoiding costly downtime.
Going Green with EV Charging
Green energy and sustainability are at the forefront of modern electrical installation design.
Recognising the shift towards electric vehicles, as part of the project, we installed a 22kW electric vehicle charger.
Unlike smaller 7kW chargers, a 22kW unit provides much faster charging, making it ideal for a workplace where cars are parked during the day.
This installation allows staff and visitors to top up their vehicles quickly and conveniently, while also future-proofing the site as EV adoption continues to rise.
The charger was fitted with its own dedicated metering system, allowing the client to track exactly how much energy is being used for vehicle charging.
This not only helps with cost management and fair allocation but also provides valuable data for sustainability reporting.
The Results
The completed installation has ensured this FC Workplace project is a safe, efficient, and environmentally responsible space.
- Staff benefit from a safer workplace.
- Facilities managers can monitor energy use in real time and make informed decisions about efficiency.
- The company has reduced its carbon footprint through energy-saving measures and EV charging provision.
- Critical equipment is protected, reducing the risk of costly repairs and downtime.
In Summary
For the client, this wasn’t just a compliance upgrade – it was an investment in the future of the building, their business and their people.
With GEC’s expertise, they now have an electrical infrastructure that balances safety, efficiency, and sustainability, giving them peace of mind today and confidence for tomorrow.